Final Inspection Release

  • Undertake formal final inspection release prior to the dispatch of equipment to site.

QA/QC Documentation

  • Verify all quality documentation is being maintained and delivered in accordance with the contract.
  • Sign off on ITP’s as required.
  • Undertake desk top audits of the Manufactures Data Report during fabrication, welding and coatings

Good-Size-Load-ex-RPG

46-2983-1200-700-80

5.4-141-1200-700-80

 

249framelhgg