• Ensure the Vendors Inspection and Test Plan (ITP) is approved prior to the commencement of the project.
  • Verify the manufactures Product Technical Data Sheets (PTDS) are on file are being complied with by the Vendor.
  • Verify the Manufactures Safety Data Sheets are on file and are being complied with by the Vendor.
  • Verify the blast medium complies with the requirements of the relevant specification and standard.
  • Verify the paint product complies with the approved manufactures specification and relevant standard.
  • Verify the applicators inspection devices are calibrated correctly.
  • Inspect the blast surface complies with the profile specified.
  • Verify the application of a compatible sealant is applied for areas that cannot be accessed with coating.
  • Monitor the mixing and thinning of coatings comply with the manufactures guidelines.
  • Inspect Wet Film Thickness (WFT) of coating complies with the specification.
  • Undertake random ambient weather checks for compliance during coatings.
  • Inspect Dry Film Thickness (DFT) of coating complies with the specification.
  • Undertake random environmental testing for compliance during coatings.
  • Verify curing times are compliant prior to manual handling and transport.
  • Verify that the final cured coating is free from runs, sags, misses overspray, holidays and foreign inclusions.
  • 032